LOAD LINEAR in time in the STEP
LOAD LINEAR in time in the STEP
(OP)
Hi everybody!
I want to apply a LOAD LINEARLY in time during a sub-interval of a STEP. For exemple:
Total time of STEP: 3600
LOAD 0 at time 0
LOAD 15 at time 10
LOAD 30 at time 20
Does anyone know how to do it?
Thank you
Regards
I want to apply a LOAD LINEARLY in time during a sub-interval of a STEP. For exemple:
Total time of STEP: 3600
LOAD 0 at time 0
LOAD 15 at time 10
LOAD 30 at time 20
Does anyone know how to do it?
Thank you
Regards





RE: LOAD LINEAR in time in the STEP
Loads Module --> Choose Mechanical Concentrated Force (for example) --> Select Application point on model --> Fill in the Edit Load Window for magnitude / directions --> Amplitude Select Create --> Tabular. Pretty much self explanatory from there. Default is two rows, right click to add row. Change Time Span to Total Time.