×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

drill cycle in 5-axis dual table post

drill cycle in 5-axis dual table post

drill cycle in 5-axis dual table post

(OP)
I have made a heidendain post of DMU eVo 50, everything was the way I like, but only one thing bothers me:

when drill operation right after finish wall:

80 ;  OPERATION: SPOT_DRILLING - TOOL: T1 SPOT_DRILL_.25
82 ;  =============================================================
84 CYCL DEF 7.0
86 CYCL DEF 7.1 X 0.0000
88 CYCL DEF 7.2 Y 0.0000
90 CYCL DEF 7.3 Z 0.0000
92 TOOL CALL  1 Z DL+0 DR+0
94 TOOL DEF   9 L2. R0.0
96 S4000 M3
98 M117
100 M116
102 M126
104 L B-102.296 C-235.103 FMAX
106 M128
110 L X1.6834 Y1.6907 Z-.5718 R0 FMAX
112 L X1.6855 Y1.6928 Z-.5873 F400. D9 M3
114 L X1.4077 Y1.415 Z-.6617
116 L X1.2688 Y1.2761 Z-.6989 F10.
118 L X1.4077 Y1.415 Z-.6617 F400.
120 L X1.4187 Y1.426 Z-.6587
122 L X1.4713 Y1.4786 Z-1.0514
124 L X1.3323 Y1.3396 Z-1.0887 F10.
126 L X1.4713 Y1.4786 Z-1.0514 F400.
128 L X1.7469 Y1.7542 Z-.9615 FMAX
130 M129
132 M140 MB MAX FMAX

that is the simulated drill cycle, D9 M3 are the problem.
any idea ?

RE: drill cycle in 5-axis dual table post

You may not have shut off your tool comp from the previouos operation? Some controllers use the D for an offset register call. In the post the D may be on the linear move line and therefore output.If I remember right on those controllers you did something like this for a D word

D00 P10 .5 for a definition  of a Q variable.
D01
D02
D03 etc.

As far as the M3 you may have a force on the M_spindle in your start of operation area.

RE: drill cycle in 5-axis dual table post

(OP)
thank you, I found that the simulated drilling cycle calls one linear move which is the default linear move with D..., thank you anyway

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources