INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

EFRT-Emergency drains

EFRT-Emergency drains

EFRT-Emergency drains

(OP)
We have some 30000 m³ tanks with diesel that, during storms, permit water draining via the emergency drains. The tanks are double deck external floating roof concept.  Main drain is not capable in draining storm intensities, and roof cannot cope with heavy water loads.
The water that crosses the product in its way to bottom ends up mixing/dispersing to an undesirable degree.
There is a local idea to use a hose in these emergency drains, diverting the water directly to tank bottom. It is expected that this procedure will decrease water dispersion in product.
A test is mandatory, but there are some concerns that this new hose could get entangled with the main flexible drain.
I know that the best procedure would be to increase draining capacity, but this can be done only during tank maintenance.
The hose to divert water directly to bottom ( with supposed decrease in water dispersion) can be installed right away.  
Comments are welcome.
TIA
dkf  

RE: EFRT-Emergency drains

AS you know emergency drains are intended to save external floating roof from being immersed. I believe that you can redirect water from some adjacent deck support by  drill a hole in their body and then place a  short hose in each one, in this way your hose will not interfere with flexible drain pipe.
 

RE: EFRT-Emergency drains

(OP)
Thank you for your comment siamak60!
We have not considered this idea yet.
I will check the supports located in central area that are outside the main flexible drain movement area.
If feasible we will be able to increase emergency drain flow, that is clearly not sufficient.
Estimates show that during storms we can have water retention peaks reaching 60 cubic meters for 15 to 30 minute periods.
One 6" main drain and two 6" emergency drains for a 54 meter diameter tank is not sufficient in tropical sites.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources