Boundary conditions Connections and loads
Boundary conditions Connections and loads
(OP)
How do you know if your Connection methods and Loads are applied in the manner the same as Product your building? Deigning a gate system for the bottom of a big grain vessel.
IS this an experience thing or is the some guide lines somewhere ?
IS this an experience thing or is the some guide lines somewhere ?





RE: Boundary conditions Connections and loads
www.priamengineering.co.uk