INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

MTR Requirements

MTR Requirements

MTR Requirements

(OP)
Are MTR's a requirement under ASME code for all pipe materials when building to B31.1 code? In other words, are MTR's required for all pipe materials if building to B31.1 code? This is not specifically addressed in the specs or contract requirements. We are being asked by our client to provide MTR's for our pipe and fittings which is not typical.  We are a storage tank manufacturer and the nozzles and overflow lines are the materials in question.

RE: MTR Requirements

Yes, CMTR's are required for the "PP" portion of B31.1 work.  Balance can be run w/o, if the pipe is legibly stenciled.

Two questions:  1) Why is a tank shop fabbing pipe to B31.1 "Power Piping" [high-pressure steam code]? The requirements of even the non-stamped portions of a pipe system are MUCH more stringent that ASME B31.3. Using B31.3 "Process Piping" Code seems more appropriate.

2)  Why would you want to buy pipe from a supplier that is unable/unwilling to provide a CMTR to match the Heat Number stenciled on his pipe?

Even when working to B31.3, I require CMTR's from suppliers.  Allows me to assure everybody that the pipe meets the Spec's, and that it has come from a country that does not allow falsification of CMTR's  

RE: MTR Requirements

budde1,
Just in addition to Duwe6s response (B31-3 would be much more appropriate as noted).
Generally your tank and vessel codes are applicable up to the first flange face or welded joint so your nozzles would fall under the tank code and not a piping code.
Regards,
Kiwi

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources