INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Dam engineering design / mass concrete design

Dam engineering design / mass concrete design

Dam engineering design / mass concrete design

(OP)
I previously posted this under the Structural forum and it appears to have been removed.  If you had responded to that thread, please respond here as well since I very much need an answer to this question.  

I have been asked to determine the number of 5' lifts that will be required on a concrete headwall that spans across the opening for a tainter gate on a new dam.  Specifically, I need to calculate how many lifts need to be in place before the shoring can be removed.  The lifts would need to support their own weight as well as the weight of the next 5' lift when poured.  I also will need to determine what load the shoring will need to be capable of carrying.

Does anyone know what codes would be applicable to this design.  There is very little reinforcing in the headwall and all that there is is located in the first two lifts.  The first lift has reinforcing in the skin.  The first and second lifts also have reinforcing in the top of the pour that is embedded in the dam piers.  This reinforcing does not run the entire span, but rather ends at a distance of 8' from the each pier.  The headwall spans 24', so the middle 8' does not have any reinforcing in the tops of these two lifts.  

I really appreciate any feedback the community might have.

 

RE: Dam engineering design / mass concrete design

The ACI has a forming design manual that will give you the information you need.  Check on their website and order it.

Mike McCann
MMC Engineering

 

RE: Dam engineering design / mass concrete design

(OP)
Thanks msquared48,

Will the forming manual deal with the question of the number of required lifts before the shoring can be removed?  In other words, I need to analyze the headwall as a largely non-reinforced mass concrete beam.  I would imagine that after the beam is thick enough, it would act mostly in shear and the rebar would not be important.

Thanks

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources