INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

API 660 - Section 7.6.2.4

API 660 - Section 7.6.2.4

API 660 - Section 7.6.2.4

(OP)
Other fabricators:
Just want to get a sense from others in the industry on how strictly this requirement is adhered to in general.

The reason I ask is we just started an Order where we are replacing the tube bundles in several heat exchangers, originally fabricated in 2008.  The units are TEMA type AES, and the fixed head tubesheets have neither indepenedent bolt circles, nor tapped bolt holes.  The owner provided us with drawings, which had called for API 660 construction.

-TJ Orlowski

RE: API 660 - Section 7.6.2.4

TJOrlowski, 7.6.2.4 applies to B-head only, no removable channel cover.

For new construction B's, no question I'd do it.

For replacements, well, you work with what's there.

Regards,

Mike

 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources