INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Effective length of sign post

Effective length of sign post

Effective length of sign post

(OP)
We have been asked to check if two 460UB67s will work for supporting a 15m tall x 3.55m wide sign. We usually do big monopole signs which have circular posts, so the member capacity is equal to the section capacity.

On this one however Im not quite sure as to what to take as my effective length? There will be girts fixed off to each side of the posts continuously. Is there any guidance as to whether these girts can be used as restraints, so each seperate post is effectively restraining the other?

Bit of a grey area for me, so any guidance / references is appreciated  

RE: Effective length of sign post

Handex,

How do the girts restrain the beam? What stops both beams buckling in the same direction?

RE: Effective length of sign post

The girts would provide some restraint, but it is difficult to quantify.  Sheeting on the girts could be considered as a diaphragm, but I would prefer to provide diagonal bracing.

RE: Effective length of sign post

(OP)
csd72,
The girts will be fixed off to the beams with purlin cleats and a single bolt. As for "What stops the beams buckling in both directions?", thats exactly what I am thinking too. It seems like in reality it will be better off than a unsupported 15m cantilever, but quite worse than being restrained at the girts.

Hokie,
Thanks for the response, but even if there is a diaphragm on each side of the beams, what stops them both theoretically buckling in the same direction?
 

RE: Effective length of sign post

The trick that I have used in the past is to put some diagonal bracing behind the sign panel thus forcing the beam buckling into a double curvature.

If you dont do something like this then I would say you have an unrestrained cantilever.

By the way, the purlins do actually help if they have two bolts as they provide torsional restraint but this is hard to quantify by some codes.

RE: Effective length of sign post

Yes, I would say with two bolts to the purlins, the double diaphragm (one each side) would be able to take the weak axis load to the ground.  With single bolts, no.  Hard to justify, though, so I would put bracing on the centreline of the 460UB's.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources