INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Proper storage of steel on the site

Proper storage of steel on the site

Proper storage of steel on the site

(OP)
On a site visit yesterday, I saw that some steel (some edge angles, a couple of joists) were not properly stored as they were sitting on the ground, exposed to earth and elements. I told the contractor that per specs he needs to place these items properly. He asked me as to how I wanted these stored, my response "means and methods, but for sure they should bot be touching the ground".

Isn't storage a means and methods issue, and was simply pointing it out is enough?
 

RE: Proper storage of steel on the site

ow long will they be laying there?

How will they be moved into position?  Crane pickup?  Forklift to intermediate station?   

What is the material?  What is the finish?   Primed, painted, galvanized, pwder coated?   Interior final trim and finish, or raw structural members?   

Rebar?   Tool steel fine machined parts?   Decorative rails and stair?   

Each needs to be handled a little bit different.  Laying ANY directly on the ground is "wrong" - but does this guy need a "rule" to build things?      

RE: Proper storage of steel on the site

The material should be stored off the ground and allowed free drainage and air circulation.  Here's part of the commentary from AISC on handling and storage"

The Erector is responsible for the proper storage and handling of fabricated Structural Steel at the job site during erection. Shop-painted Structural Steel that is stored in the field pending erection should be kept free of the ground and positioned so as to minimize the potential for water retention.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources