INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

TMLs /CMLs

TMLs /CMLs

TMLs /CMLs

(OP)
Anyone have an idea how many TMLs/CMLs in average can an inspector do in a 8 hour shift? Pipes and fittings during a shutdown.

RE: TMLs /CMLs

Don't know, but I bet a below average inspector could do a lot more.

RE: TMLs /CMLs

Sorry, but the question is too nonspecific.  Speed depends on ease of access and time to "Pull a Permit" and get into the necessary safety gear to work in a particular process unit.

In an HF-Alky unit, I would be happy to get 10 TML's in an 8-hr day, and would accept 4.

In a pipe rack that has a catwalk, 10 TML's an hour - 80 a day.

Around pumps and Control Valves, accessible standing flat-footed on the ground, 200 or so.

In a Chemical Recovery boiler [burns Black Liquor] in a papermill, with someone buffing the tubes ahead of the inspector, 6000 in 12-hrs is poor to nominal, and 10,000 is pretty good.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources