INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Gravity Thickener Installation Time

Gravity Thickener Installation Time

Gravity Thickener Installation Time

(OP)
Hello Everyone-

I am trying to estimate how long it will take to install gravity thickener equipment (full diameter rake arm & center support column) in a newly constructed 60 ft diameter concrete tank. Any suggestions on how to estimate this? And while I'm asking, do any of you know of a good resource(s) for estimating construction/installation times for various water/wastewater treatment plant process?

RE: Gravity Thickener Installation Time

This equipment is generally prefabricated and can be assembled in 3-4 weeks assuming the equipment is already on site.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources