INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Punching Through A Radiant Slab

Punching Through A Radiant Slab

Punching Through A Radiant Slab

(OP)
Just wanted to bounce a common question around to see what kind of methods are used.....I'm trying to get a square concrete pad footing below an existing 4" slab on grade with radiant. My past experience with cutting through radiant slabs is that things don't fare too well for the radiant (impossible to splice and avoid leaks).

I'm looking at micropiles as an alternative. Has anyone else used any other techniques to avoid disturbance to the slab but still get good bearing? Compaction Grouting?

The slab can not support the column load by itself, so that is out of the question.

Being as how this is in the inside of an existing house, it would be great if the solution didn't involve a drill rig the size of a truck.

RE: Punching Through A Radiant Slab

How big does the footing have to be?

Ridiculous as it may seem, depending where it is, is there any way the footing could be poured above the slab?

Mike McCann
MMC Engineering
Motto:  KISS
Motivation:  Don't ask

RE: Punching Through A Radiant Slab

Mike, that's a good idea, if it can be verified that the slab is still really well supported by the ground underneath. It may have settled.

Bigmig, our radiant floor heat was about 6" apart, max.  Can you span across the slab to the outside and avoid an interior column?

RE: Punching Through A Radiant Slab

Could a GPR locate the radiant tubes so you could avoid them? Or would you have to give the heating system a barium enema first?

     "...students of traffic are beginning to realize the false economy of mechanically controlled traffic, and hand work by trained officers will again prevail." - Wm. Phelps Eno, ca. 1928

RE: Punching Through A Radiant Slab

(OP)
The footing is going under living space, so unless the owner wants a permanent coffee table in the shape of a big square concrete block we will have to pass on that idea of going above slab.

We have investigated the clear span idea, which is an option, but we want to compare that option to this one as far as price goes.

I have worked on jobs where we located the radiant in the past and finding it is not the hard part. The hard part is getting the concrete out while leaving the radiant. The hardness of the concrete takes a jack hammer and the softness of the radiant hose does not do well when jack hammered.

Thanks.
 

RE: Punching Through A Radiant Slab

could you use a core saw to cut a series of hole between the radiant tubes?

RE: Punching Through A Radiant Slab

How about driving small diameter piles through the holes cored out that SWC suggested above?  

My wife's uncle had a settling basement that was reinforced like this with a bunch of driven piles around the perimeter that were bracketed to support the foundation.  There was no radiant to consider, but all the installation was done inside the basement.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources