INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NORDSTROM FIG NO. 66128 or equivalent valve
2

NORDSTROM FIG NO. 66128 or equivalent valve

NORDSTROM FIG NO. 66128 or equivalent valve

(OP)
Can any of you guide me where can I find NORDSTROM FIG NO. 66128 or equivalent valve.

RE: NORDSTROM FIG NO. 66128 or equivalent valve

(OP)
Many thanks to gerhardl & hsbcn for your valuable advise. I contacted Flowserve to obtain quote for 3 pieces but no reply as the quantity is too small. I am also ready to wait as production will take long time due to less qnty. Could you please suggest me where can I order 3 pieces of this valve

RE: NORDSTROM FIG NO. 66128 or equivalent valve

(OP)
Many thanks to gerhardl & hsbcn for your valuable advise. I contacted Flowserve to obtain quote for 3 pieces but no reply as the quantity is too small. I am also ready to wait as production will take long time due to less qnty. Could you please suggest me where can I order 3 pieces of this valve  

 
 

RE: NORDSTROM FIG NO. 66128 or equivalent valve


A replacement of an older valve is always a question of several things, I presume also for Yourself and Flowserve:

1. Availabillity of suitable production equipment and material including castings, drawings and availabillity of production capacity.

2. Cost of production and and obtainable salesprice.

Flowserve is a world-wide company, and if you do not get an answer from your local representative under threat of complaining centrally (remember that a correct answer could take some time, so ask for when you can expect an answer or require an answer within reasonable time), you could do following:

Ask (through main office of Flowserve?)for minimum quantity for accepted order: (five? ten?) and compare the price with the cost of other replacements or specially machined alternatives. (Some  companies specialise in making 'tailor made' products, but it will cost), last alternative is of course to alter your construction to include valves of newer type and other brands.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources