INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HELP 3 Landfill Modeling

HELP 3 Landfill Modeling

HELP 3 Landfill Modeling

(OP)
Ok where are my fellow landfill designers?  I am experimenting with a somewhat non-conventional cover for a non-rcra site.  The thought is to have the upper-most layer be 24" of gravel (Configuration 1).  

It seems that as soon as I switch the top layer in HELP3 to a highly permeable material (such as gravel-texture 21, or sand-texture 1) the peak day volume collected on the cap membrane exceeds to the total peak day precipitation.  How could a cap collection layer collect more water than falls on the site?   

[Configuration 1]
layer 1 GRAVEL           24    HORIZONTAL
layer 2 DRAINAGE NET    1.97    HORIZONTAL
layer 3 GEOMEMBRANE     4.72    MEMBRANE
layer 4 BENTONITE           2.36    HORIZONTAL
layer 5 GEOMEMBRANE     2.36    MEMBRANE
layer 6 SILTY SAND      480    VERTICAL
layer 7 GRAVEL           24    HORIZONTAL
layer 8 GEOMEMBRANE     4.72    MEMBRANE
layer 9 BENTONITE           2.36    HORIZONTAL
layer 10 GEOMEMBRANE    2.36    MEMBRANE

Peak day precip. = 1.90"
Lateral drainage collected on layer 2 = 6.15"

Output is fine under Configuration 2, where the only difference is the replacement of the top gravel layer with a more traditional barrier/veg system.  

[Configuration 2]
layer 1 ML - TEXTURE 8     6    VERTICAL
layer 2 SOIL BARRIER      18    BARRIER
layer 3 DRAINAGE NET    1.97    HORIZONTAL
layer 4 GEOMEMBRANE    4.72    MEMBRANE
layer 5 BENTONITE            2.36    HORIZONTAL
layer 6 GEOMEMBRANE    2.36    MEMBRANE
layer 7 SILTY SAND    480    VERTICAL
layer 8 GRAVEL             24    HORIZONTAL
layer 9 GEOMEMBRANE    4.72    MEMBRANE
layer 10 BENTONITE    2.36    HORIZONTAL
layer 11 GEOMEMBRANE    2.36    MEMBRANE

Peak day precip. = 1.90"
Lateral drainage collected on layer 2 = 0.86"

Output for configuration 1 attached.  Thanks in advance for any responses!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources