×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

extending coverage 15' into lower hazard

extending coverage 15' into lower hazard

extending coverage 15' into lower hazard

(OP)
When extending the coverage from the higher hazard 15' into the lower hazard, how do you separate the two systems? And am I allowed to use diferent k-factors in the lower hazard area? I have a warehouse with rack storage attached to an OH GP 2. Is there a way that I can avoid spacing into the lower hazard?

RE: extending coverage 15' into lower hazard

Draft curtains can be used to provide a physical separation between two different sprinkler systems in the same building.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources