INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NYS DEC Notice of Termination of Post Stormwater Practices

NYS DEC Notice of Termination of Post Stormwater Practices

NYS DEC Notice of Termination of Post Stormwater Practices

(OP)
We are getting ready to file a NOT with the NYSDEC.  We were performing stormwater inspections up until now; my question is do we still need to continue performing these inspections now that the NOT is filed or does the NOT signify the complete end of inspector's needs as well?

Thanks

RE: NYS DEC Notice of Termination of Post Stormwater Practices

Someone has to do it. Check the maintenance plan in your SWPPP or erosion control plan.

Normally, the developer's inspection responsibility ends once the NOT is accepted, and the owner &/or tenant bears the responsibility for future inspection and maintenance of the system.

 

     "...students of traffic are beginning to realize the false economy of mechanically controlled traffic, and hand work by trained officers will again prevail." - Wm. Phelps Eno, ca. 1928

RE: NYS DEC Notice of Termination of Post Stormwater Practices

Are you talking about the Qualified Inspector inspections required during construction under the Construction Activity General Permit for erosion and sediment control (E&SC)?
(webpage:  http://www.dec.ny.gov/chemical/43133.html)
(2010 General Permit:  http://www.dec.ny.gov/docs/water_pdf/gpsconspmt10.pdf)

if so, then once construction is complete, Final Stabilization of vegetated areas is achieved and the permanent stormwater controls (if any) are operating, then you can file the NOT and end the construction E&SC inspections.  Read the relevant sections in the General Permit for explanation.

The operation and maintenance plans for the permanent controls should specify the post-construction inspection requirements for the BMPs after construction during operation and who should conduct them.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources