INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Pavement Subgrade Mitigation

Pavement Subgrade Mitigation

(OP)
Hi,
I am seeking a second opinion of a geotechnical professional. We have to reconstruct the pavement of a parking lot (1.75 acre) the parking will have stalls and driveways for trucks use. We were told the subgrade consists of stiff to hard High Plastic clay with moisture content varying between 23 to 36 percent and an R-Value of 5. My questions are:
1) I know engineers would like the subgrade compacted to 95 percent but this is stiff to hard clay, can we go without compacting the subgrade or maybe compact the finish subgrade surface to 90 percent?
2) how's handling High Plastic Clay during excavation? and is it cheap to excavate and replace with aggregate base?
Thanks for your imput.

RE: Pavement Subgrade Mitigation

colzy
I think I have some info for your problem. First,some questions:
 is the R Value from a Hveem Stabilometer Test?  assuming Yes then,
 do you have Swell values from the Hveem Test for each individual sample?
 is the R Value = 5 or is it actually <5?
 was the swell considered critical to arriving at the R Value?
 what is the value of gravel equivalent section, from the plotting of Stabilometer gravel vs swell gravel?

RE: Pavement Subgrade Mitigation

The R-value needs to be determined for the saturated sample, especially for a clay material.  The properties of the clay will be very different depending on moisture content.  Many times the subgrade soil is only evaluated at the in-situ moisture content at the time of evaluation. The problem with this is it does not account for seasonal variations in the moisture content.  All soil subgrades will become saturated during sometime in the life of the pavement and that will typically be the critical condition for the pavement.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close