INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

DREDGED IN VERY STIFF TO HARD CLAY

DREDGED IN VERY STIFF TO HARD CLAY

DREDGED IN VERY STIFF TO HARD CLAY

(OP)
Dear colleagues, do you believe that a saturated clay stratum with a consistency among stiff to very stiff even hard in some points, and I mean where N oscillates between 15 and 30 blows and some points up to 35 blows, could be dredged combining the suction and a disintegration jet? Or one should already think in to use the suction provided with a normal cutter.

I thank your comments.

RE: DREDGED IN VERY STIFF TO HARD CLAY

Dual handling operation using cutter suction and trailor suction dredger could be helpful in this case coz cutter should be able to cut N35 strata....

Dredging coorporation is having a poweful cutter dredger "Aquarius" similar dredger can be deployed for teh operation.

RE: DREDGED IN VERY STIFF TO HARD CLAY

(OP)
Amandeep, thanks for your comments.

RE: DREDGED IN VERY STIFF TO HARD CLAY

hello matey, reading your question in here I was wondering what you were dredging in that how small or large the area you were dredging
ie:- has the spoils got to be removed or just put to the one side as in a pipeline or a tinplate.
There is a company  in Nroth-west England that have devoloped a 10 inch flow dredger that can just about remove any kind of clay you want to throw at it na dit was designed for cable trenching and10 inch pipelines. there web-site is under construction at the moment but they are always ready to and csan be contacted throught info@seabedsystems.com
Best regard
TT340

RE: DREDGED IN VERY STIFF TO HARD CLAY

(OP)
Dear TT340, I thanks your interesting comments, and I also tell you that dredged works are dedicated for a Marina located mostly in earth, for what the dredged material should be removed from the place to a distance of approximately 2 Km.

Cordial greetings.

RE: DREDGED IN VERY STIFF TO HARD CLAY

greetings again friend,
I take it that you have your own dredging equipment, I operate diver operated dredges up to 4" and the excavating rates for them are quite good "about 6 tons an hour" in good weather conditions and the spoils can be transported to 2km that you require.
If I can help in any way do write back.
Best regards
TT340

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources