INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Beam to Column Web Moment Connection

Beam to Column Web Moment Connection

Beam to Column Web Moment Connection

(OP)
I have attached a sketch of my question.  I have received and inspection report that notes that the stiffeners added to the column web to transfer the moment into the column apparently were installed in the wrong position and therefore do not exactly line up with the beam flanges.  I have a couple of questions, one is how can the full penetration weld still pass with this fit-up, and two is there any allowable fit-up difference as shown, when I look at the AWS code it allows fit-up difference in the dimension between the plates but not horizontal fit-up.  See attached image.

  

RE: Beam to Column Web Moment Connection

I am unclear on exactly what you are asking but I have never seen a fit-up like the one presented in the attached sketch.

RE: Beam to Column Web Moment Connection

Although AWS has fit-up tolerances, it is not intended to address whether the available weld is adequate.  As shown you are losing a significant amount of the flange cross-section.  I typically recommend increasing the web moment stiffener plate thickness by 1/4"-3/8" to account for miss-alignment (as shown), mill tolerances, and flange tilt.  The moment capacity as shown is reduced to the cross sectional area of the weld, (Area x Fy x (0.6 or 0.9) x beam depth).  The stiffener should be A572-50 to match the beam flange, or this will be an additional decrease in strength.  Is the reduced capacity adequate for the load?   

http://www.FerrellEngineering.com

RE: Beam to Column Web Moment Connection

I did not answer your specific question.  The CJP weld passes, but for a less effective depth.  The inspector should question whether the effective weld depth is adequate for the intended condition.  The weld can UT and show no defects, but the actual depth of weld is less than intended.  This should be noted in the report as a non-conformance.  The inspector should note when the effective weld depth of a CJP is less than the thickness of the thinner part.   

http://www.FerrellEngineering.com

RE: Beam to Column Web Moment Connection

(OP)
Thanks for your help, and the inspector did note the change in effective depth of the weld.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources