INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Composite Bridge Deck

Composite Bridge Deck

Composite Bridge Deck

(OP)
Hello,

I'm using Sap2000 to model a cable stayed bridge with a composite deck ( steel beams + concrete deck). I tried to model the composite beams using section designer. I selected as base material the steel and then on top of the steel beam i drawn a rectangular shape and selected Concrete material for it. I'm not satisfied by the results.
my 2 questions are :
Can i model composite beams using section designer? and how ?
Which would be the best method to model this type of deck. ?

 Much Thanks.

RE: Composite Bridge Deck

Flomadan

I think you should model the section with 0,0 at the centroid. And try with a few simple sections first before using a complex bridge girder section

respects
ijr

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources