hec-ras inline weir
hec-ras inline weir
(OP)
I am modeling a stream that goes under a bridge at a skew and then takes a hard left turn and runs parallel to the road. The bridge is higher than the roadway, so the water will back up behind the bridge opening and then spill over the road, but not overtop the bridge. When it does this it will not enter the next downstream section, but will actually go three to four sections downstream and bypass the channel for several hundred feet. Ideally i could set up the road as an inline weir that when overtopped empties into the left overbank of the stream at a downstream section several hundred feet downstream, but I don't think this is possible. Any ideas how to model this behavior?
Just and EIT
Troy
Just and EIT
Troy





RE: hec-ras inline weir
If I understand correctly the roadway parallels the watercourse and is not across the channel. This would be a split flow scenario rather than inline. you can model this split using the geometry of the roadway and an appropriate weir coefficient. once split from the main channel you can either return the flow to a downstream xsec or you can model a secondary reach down to the xsec. This is not an uncommon condition.
RE: hec-ras inline weir
How about modeling the road as a lateral weir, separate from its bridge (modeled separately as a bridge or inline weir), where the lateral weir connects the cross-sections upstream of the bridge to those downstream of the bridge.
RE: hec-ras inline weir
Drew, you understand the geometry. My problem, unless you know a way around this, is that the reach cross sections are roughly parallel to the road upstream, and perpindicular DS. There isn't really a lateral wier upstream because the angle is more inline. Are you suggesting that I make a lateral weir Downstream, and input all the flow that overtops at the overbank of the upstream sections? Then essentially allow the program to compute this as a negative flow? Would that work? Now that you mention it I think I have heard that this works? Have I understood you correctly?
Thanks
Troy
RE: hec-ras inline weir
A sketch would help. Have you considered that maybe the flow that weirs over the road does not completely return to the main channel? If it does not return then just split the flow without returning it. The lateral weir concept as Drew mentioned is the same concept I stated with the split, I just use HEC2terms. If your flowline makes a 90^ bend at the road under the bridge, I would model at a split or lateral weir; but use momentum rather than watersurface.
RE: hec-ras inline weir
If I were to use the same geometry and make a lat weir DS, emptying upstream, would the negative flow be accounted for correctly by HEC RAS, since in real life water would spill over weir from Upstream to downstream? Does my question even make sense?
Just an EIT,
Troy
RE: hec-ras inline weir
Just an EIT,
Troy
RE: hec-ras inline weir
RE: hec-ras inline weir
Just an EIT,
Troy
RE: hec-ras inline weir
With out a scale or purpose in mind, it's hard to judge. But, do you really need that dense of cross-sections? I'd suggest keeping the section immediately downstream of the bridge, but delete the next 4 or 5, so that the second cross-section downstream of the bridge is at the low point of the road.
Then, I'd consider two options:
1.) Extend the downstream cross-sections left across the road, so that the road is a levee within the cross-section and not an adjacent parallel feature. Include the road as XS Levee element in the downstream cross-sections. Essentially keep the cross-sections as shown in your figure except connect the left branch and north branch cross-sections, and eliminate the left branch. It looks like the road (i.e., levee) actually extends upstream through your upstream cross-sections as well, where you have ineffective flow designated? Or,
2.) Set the left over-bank downstream lengths between the sections downstream of the bridge to something very low. Channel and right overbank downstream lengths would remain as shown. This would allow you to model the bridge as a skewed weir with a low overtopping point on the left side, where overtopping flow, which is overbank flow, would not travel the several hundred feet of channel, but rather the insignificant overbank length.
RE: hec-ras inline weir
1. Flow continues through the bridge without overtopping road/bridge and backwater occurs left and right on the upstreamside of the bridge.
2. Flow can escape the left along the left side of the bridge and not re-enter the original watercolurse with out over topping the roadway.
I agree with Drew. re-examine your xsecs and apply flow diversions as needed. It may be an iterative process. If I think there will be a flow breakout, I model one. HECRAS will compute losses and gains if properly coded.
RE: hec-ras inline weir
Thanks for all of the help. Let me know if something I just said is wrong...
Just an EIT,
Troy
RE: hec-ras inline weir
I have a lateral structure DS that feeds back into the reach just US of the bridge.
Thoughts?
Just an EIT,
Troy