INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Maximum Outflow rate requried

Maximum Outflow rate requried

Maximum Outflow rate requried

(OP)
Please helpo, I am designing a detention and I need to know how to calculate the maximum outflow rate required. This is my data:

Detention Calculations- The Barns at the Depot        
        
Existing Impervious Cover=    0.118    AC
New Impervious Cover=            0.308    AC
Increased Impervious Cover=    0.190    AC
        
Detention Summary        
        
Area Serviced New Impervious    0.190    AC
Detention Storage Rate    Cs=1 AC-FT/AC    
Detention Storage Volume Required    0.190    AC-FT
Detention Storage Volume Provided    0.208    AC-FT
Maximum Outflow rate Required ????

RE: Maximum Outflow rate requried

How do you know your detention storage provided if you haven't designed your pond's outlet control structure yet?

In many municipalities, the maximum allowable discharge rate equals the existing discharge rate.  To determine that, you'll need not only to know your existing impervious cover, but also your total watershed broken down by all different kinds of cover, your time of concentration of your drainage basin, and event storm rainfall data.  Then you'll need to select which method you're using to calculate it, (NRCS/Rational) and stick to that method throughout the process.

In some municipalities they do not let you take credit for existing impervious cover.  In some they require a percentage reduction beyond existing.  Some both.  Some make you manage multiple storms.  In some they do not go by existing discharges at all, and simply set an allowable based on the capacity of downstream structures.  In some they make you model all the downstream structures between you and a major point of discharge to prove you're not impairing them.  In some you have to provide other functions with your stormwater pond as well, such as water quality protection.  In some regions of the country they're getting very particular about that as the EPA starts twisting the knife over MS4's TMDLs.  

Your question is complicated, and if you don't know what you're doing you can get yourself or your client sued.  Consider contracting with a professional.

Hydrology, Drainage Analysis, Flood Studies, and Complex Stormwater Litigation for Atlanta and the South East - http://www.campbellcivil.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources