INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Retaining Wall Construction Method

Retaining Wall Construction Method

Retaining Wall Construction Method

(OP)
I have a 10m high reinforced concrete to be constructed.

The contractor wishes to pour in 1.2m high sections and backfill & compact both sides of the wall to simplify the formwork. The fill in front of the wall will then be excavated out when the wall is complete.
 
Anyone ever do this, what should I look out for?

I don't see any problem in theory, the reinfocement will be continuous and scabbling will be done before each pour.

Kieran
 

RE: Retaining Wall Construction Method

Lots of messy construction joints in the face of the wall when it is all finished.  Is that acceptable?

 

RE: Retaining Wall Construction Method

(OP)
Yes the wall is on a mining site, appearance don't matter

Kieran
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources