INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Check list for Cross country pipeline design

Check list for Cross country pipeline design

Check list for Cross country pipeline design

(OP)
Dear Friends,

Can anyone give me a checklist for the design of cross country pipelines?
Is there any method to calculate the manhours for engineering cross country pipelines (based on historical data)?

Thanks in advance,

S.BharathKumar

RE: Check list for Cross country pipeline design

Yes, people can do all of those things, but probably won't.  You are asking for things that are very much local (it costs me more to build a pipeline in Colorado than in New Mexico for example and they are adjacent states in the same country, a fact that was pretty expensive to learn) both because of variations in the labor market and variations in regulatory requirements.

I have numbers that I use, but to share them would imply that: (1) they don't represent a competitive value to me; and (2) that I believed they were universal.  Neither of these conditions are true.  

When I prepare a cost estimate (or a pipeline design document), I have a list of things that I make sure happen (a checklist if you will, but it is more than that).  My list is different than the next guy's list.  Neither one is perfect.  Neither one is worthless.  Both lists represent the things that we've found important on previous jobs.  The only way to develop that list in a format that means something to you is to do it wrong a couple of times.  When I started, an old hand gave me his check list.  I found that if I followed it exactly I would build crummy systems that didn't work very well (and ignored changes in local regulations).  I quickly saw that and started building my own list.

David

RE: Check list for Cross country pipeline design

a234f56

You don't calculate man-hours for a cross ocuntry pipeline - that is for plant work.  Basically you build crews based on the work to be done and determine how many days it will take each crew (with the welding crew setting the pace as far as daily progress), including overheads & support.  

It's not complicated, but also not conducive to sending a checklist.  As David mentioned, everyone has their own methodology & models.  I have bid work for many different mainline contractors and they all approach it a little different, but at the end of the day they are typically pretty competitive with each other and fairly accurate.

Greg Lamberson, BS, MBA
Consultant - Upstream Energy
Website: www.oil-gas-consulting.com
 

RE: Check list for Cross country pipeline design

You might get close with TIC = $100,000.00 per diameter-inch-mile and engineering = 3% of TIC.

Regards,

SNORGY.

RE: Check list for Cross country pipeline design

Or you might not be close...

But I would figure out your historic $/(d - i - m) and take engineering at 3% - 5% of whatever that works out to be.

Regards,

SNORGY.

RE: Check list for Cross country pipeline design

(OP)
Thank you all for the direction.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources