INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HRSG duct firing

HRSG duct firing

HRSG duct firing

(OP)
Hi,
I'm designing a new HRSG with duct firing. As the duct firing is very heavy, I was wondering:

1. what is the best location for the duct burner in the HRSG (before or after HPSH)

2. if there are any limitation as to the extent of firing.
 
3. I would prefer not having to use P91, so what is the maximum gas temp I can have after duct firing with T11 or T22 tubes. What drives the material selection - gas or water/steam temperature?
 Any ideas?  

RE: HRSG duct firing

Now I think I have a clue as to the problems we've been having with our HRGS's  lately.

 

RE: HRSG duct firing

(OP)
Now that's not the answer I was expecting. What is the problem with your HRSG?

RE: HRSG duct firing

sv13;
The best place for the duct burner is determined by optimizing the configuration , by means of running dozens of simulations on the combined cycle simulation programs. Some will size the HRSG and provide acost estimate for each configuration.

If you don't know where to start, usually finding some other jobs already sold will point you in the rigth direction .

Some things to keep in mind:
The modern duct burners now come supplied with a radiation screen to protect the upstream bank, so it is OK to locate the DB  immediately downstream of a superheater or reheater bank. The next downstream bank, though ,will see a lot of heat not only form a high fluegas temperature but also from flame radiation- you may  need to deliberately add this to the program if you want to accurately simulate what happens.

A smart idea is to locate a boiler banks screen immediately downstream to act as the downstream rdiation shield . But if that is not practical, then ensure the downstream row of tubes includes the effect of the flame radiation. Keep the tube metal temperature within ASME allowables and the fin temperature below oxidation limits.

 

RE: HRSG duct firing

sv13,

I agree with davefitz, and add the following: duct firing temperature is also limited by the construction firing duct casing. The temperature limits of the inside casing materials is one factor. The outer skin temperature is also a factor, usually for safety reasons. High firing temperatures (rule of thumb: 1500ºF or higher) can warrant a water-wall design.
 

RE: HRSG duct firing

Not only the location of duct burners but their operation is of importance.     

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources