Does anyone have information on design loads, and other considerations, for data storage centers. Evidently there are different Tier Level ratings depending on the level of safety/security to meet the client's needs. Thanks






RE: Data Center
One reference that I use, it states requires 150 PSF for Telephone exchange rooms and central computer. The reference is UFC 3-301-01 ( STRUCTURAL ENGINEERING).