INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

help for a branch line design

help for a branch line design

help for a branch line design

(OP)
There is two 3000 m3 storage tanks (two pool of water) for feeding demineralization plant. We have two parallel pumps (2*100%) for demineralization plant. Occasionally we have shortage of water so we want to use a reverse osmosis unit.
Is there any problem to use common header for feeding demineralization and osmosis plant? We want to connect a branch line in the suction line of the pumps for reverse osmosis unit?
Or we must use separate line for feeding osmosis plant and connect it to the pools.
Q(one pump)=160 m3/h
D suction= 6"

Q (for osmosis plant)= 80 m3/h

 

RE: help for a branch line design

Chemical321,

You should consult with the pump vendor.  Many pumps have a velocity and pressure drop limit at the pump suction.  These limits are to prevent damaging forces on the pump impeller.  

At 160 m3/hr (for a 6" schedule 40) the velocity is 7 ft/s and the pressure drop is 1.3 psi/100 ft of pipe.  At 240 m3/hr the velocity is 12 ft/s and the pressure drop is 3.4 psi/100 ft of pipe.  The higher flow rate may be too much for some pumps.  

Nevertheless, according to your description not all of the flow passes to the pump.  As long as the piping branches far enough away from the suction to the pumps, the additional 80 m3/hr should not create any additional forces on the pump impeller.

 

RE: help for a branch line design

You should also conduct a hydraulics analysis to ensure that the holding tanks have enough head to move the extra water to the final destination.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources