INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

600V to 44KV grid tying options

600V to 44KV grid tying options

600V to 44KV grid tying options

(OP)
I have a grid tied solar inverter which gives me 3-phase synchronized 600V ... the grid i am connecting to is 44kv. The inverter will be supplying 3MW of power. My questions are:

1) What are the possible options for this conversion.
2) Typically i know transformers are used for this. What configuration is normally used wye-delta? Can a single transformer be used? What other aspects need to be considered for such a transformer?

Regards

RE: 600V to 44KV grid tying options

What kind of loads are fed by the grid? Do you know regulations about stations over there?

If there was no electricity there would be no internet. Good point, don´t you? :D

RE: 600V to 44KV grid tying options

You need to talk to the utility.  There are no universal answers, but each utility has its own requirements.

RE: 600V to 44KV grid tying options

(OP)
@mavd02 - I dont understand .... I am generating power - feeding it into the grid ... the grid would be the national grid feeding cities ... so you can guess the loads .... dont understand why that is important?

@davidbeach - the utility requires the system to be upto the set standards .... the implementation doesnt matter ... and currently it is too early / not possible to talk to the utility ...

More info:
We have 6 each of 500kVA inverters.  Not sure how best to connect to the 44kV grid power line.  Eg. Go with 6 step up transformers and then one final transformer. Or just go with 1 large transformer, or go with something in between.


 

RE: 600V to 44KV grid tying options

Probably lots of ways.  What are the applicable standards?  Never too early to talk to the utility.  Lots of that type of engineering is driven by economics.

RE: 600V to 44KV grid tying options

Talk to the LDC. each LDC has its own rule of the transformer configuration.

I would suggest multiple transformer close to the solar array, as single 3MW transformer that sitting in the middle of the field will cause huge AC loss at 600V level to travel to the transformer.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources