suspended concrete cut out repair
suspended concrete cut out repair
(OP)
i have a problem where i have had to cut out a square 750x750 from a 600mm suspended deck for piling purposes at a sea berth. i was wondering what was the best solution as i have just started working in this area and am a bit inexperienced. have a 100mm pre cast panel placed at the bottom of the cut out, this can be used as formwork and then rebar with existing deck and then pour in situ to fill the cut out. option 2 get a pre cast item to fit the cut out?
any help would be much appreciated.
any help would be much appreciated.





RE: suspended concrete cut out repair
I'm not sure I understand the details of your situation, but we usually restore the slab reinforcing either by saving enough of the original bars that we can weld in new bars to the remaining stubs, or we drill and grout in dowels to restore the reinforcing.
Will the slab that you are cutting be supported by the pile or does the pile just pass through to support something above the slab?
Bob G.
RE: suspended concrete cut out repair