INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

suspended concrete cut out repair

suspended concrete cut out repair

suspended concrete cut out repair

(OP)
i have a problem where i have had to cut out a square 750x750 from a 600mm suspended deck for piling purposes at a sea berth. i was wondering what was the best solution as i have just started working in this area and am a bit inexperienced. have a 100mm pre cast panel placed at the bottom of the cut out, this can be used as formwork and then rebar with existing deck and then pour in situ to fill the cut out. option 2 get a pre cast item to fit the cut out?
any help would be much appreciated.

RE: suspended concrete cut out repair

We do this all the time.  We are a marine engineering company and frequently cut thru decks for replacement piling.  

I'm not sure I understand the details of your situation, but we usually restore the slab reinforcing either by saving enough of the original bars that we can weld in new bars to the remaining stubs, or we drill and grout in dowels to restore the reinforcing.

Will the slab that you are cutting be supported by the pile or does the pile just pass through to support something above the slab?

Bob G.

RE: suspended concrete cut out repair

(OP)
the pile will have a steel headstock on top and then a 50mm grout pad to connect with the bottom of the deck. my problem is how to refill the concrete deck for structural integrity purposes. my team was initially tossing up those two options that i earlier said because we must re-fill the concrete cut out for structural integrity but if you have a different way of doing it thats better im more than willing to hear it cause we are stuck

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources