INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Concrete Cores vs. Concrete Cylinders

Concrete Cores vs. Concrete Cylinders

Concrete Cores vs. Concrete Cylinders

(OP)
Hey all, new to the forums.

I've got a job that we are testing some 7000 psi concrete for.  I've had a few pours where the concrete cylinder breaks came back lower than the concrete core breaks.  On the range of 1000-2500 psi, give or take.

I'm trying to figure out why.  I would think I could exclude operator error for my cylinder breaking guy, because the other 50 cylinders he breaks a day seem just fine.  I also assume that my cylinders were made correctly in the field (Good technician, ACI cert) and that the cores were taken correctly (My project engineer did these, whlie under supervision of an PE and the entire managment staff of the contractor).  If we agreed on these assumptions, any ideas why there would be a difference?

RE: Concrete Cores vs. Concrete Cylinders

Welcome.

First of all, the cylinders are meant to represent the mix design, not the in-place concrete.  Cores are more indicative of the in-place concrete strength than cast cylinders would be.

There are numerous reasons for the disparity, but most likely one of temperature differences.  You don't state your location, but if your ambient temperature was higher than about 75 degrees in the field, then you will get some acceleration in the strength gain.

If you are using 4x8 cyls instead of 6x12 cyls, keep in mind that ACI 318 requires that 3 4x8 cyls must be averaged for the 28 day strength or 2 6x12 cyls.

Curing conditions in the field are usually vastly different than in the lab.  This can cause field strengths to go up or down.  Keep in mind that the laboratory test is done under standardized conditions....not better, not worse...just standardized, so as to achieve repeatability and reliance on their predictability.  In many cases, the concrete in the field will gain strength faster and in some cases gain more strength...but that's not predictable.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources