INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Time Limit Between Concrete Placements

Time Limit Between Concrete Placements

Time Limit Between Concrete Placements

(OP)
Is there an allowable time limit for successive placements of concrete during a monolithic pour to prevent a cold join?  Are there any standards for this?

I know that it will depend on the mix, curing conditions, and whether the present concrete is being properly agitated to prevent it from setting.  But I would like to get a feel for what the possible range this time limit would be.

RE: Time Limit Between Concrete Placements

To prevent a cold joint, I would think you would have to place the next lift prior to initial set of the previous lift.  However, it is permissible to have a cold joint by roughening the surface and providing sufficient reinforcement across the joint to resist shear.

BA

RE: Time Limit Between Concrete Placements

abp...check the mix design and cement certificates....don't let them go past the initial set time of the cement (usually about 2 hrs from first introduction of water to the mix).  Not a hard and fast rule, but works for bonding purposes.

RE: Time Limit Between Concrete Placements

Agree with Ron. Also, when they vibrate the upper layer make sure they penetrate about a foot into the lower layer.

RE: Time Limit Between Concrete Placements

Good points; nothing significant to add except it may depend somewhat on application. Say you are pouring a slab for a basement versus a bridge slab or structural elevated slab.  

RE: Time Limit Between Concrete Placements

Temperature?   

Colder weather lets you a longer delay time, or a shorter?    

RE: Time Limit Between Concrete Placements

I think there are concrete additives that greatly extend the time before hardening.
Check with concrete suppliers.

RE: Time Limit Between Concrete Placements

When the in-place concrete has set up to the point that you can't vibrate it and mix in the new pour it is too long. The time depends on many factors including humidity and wind speed. Not sure how you would come up with a time limit.

RE: Time Limit Between Concrete Placements

ACI 301 doesn't provide a hard cutoff, probably due to the very many variables of fresh concrete.  However, that doesn't mean you can't provide a number.
Our spec says 90 minutes max, except 60 minutes for hot weather conditions, which I believe is generous to the benefit of the contractor in most circumstances.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources