INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Drilled Pier with Frost Depth

Drilled Pier with Frost Depth

Drilled Pier with Frost Depth

(OP)
I have a drilled pier with a 3ft frost depth.  The geotech report says that this depth should be neglected.  I am trying to modify the pier with a concrete cap.  Do I have to put this concrete cap below 3ft?  Thanks.

RE: Drilled Pier with Frost Depth

You should explain more about this.  What is meant by "with a 3 ft. frost depth"?  Do you mean the pier is set at a depth of 3 feet which is the local assumed depth of frost?

You might explain what they mean by "this depth should be neglected".  

If you have an assumed frost action to 3 feet, why neglect it?

A few more sentences will help.

Why the cap?  Do you need more bearing area (than that of the pier) for your load?  If that is the case, of course your bearing area should be at 3 ft. depth.

RE: Drilled Pier with Frost Depth

Neglect 3 ft frost depth?  Are you advised to be more conservative or liberal in your design?

RE: Drilled Pier with Frost Depth

It is typical for geotech reports advising to ignore top 3' or a full pier diameter for soil skin friction capacity and such. But if you want to reinforce that drilled pier with a cap, you can place it within that 3' depth, as long as you can place it on soil with adequate bearing capacity. However, you can not rely on the soil skin friction in the upper 3'. It will work in a similar manner for the uplift capacity, where you can rely on the weight of concrete and any concrete-soil interaction below 3'. I have reinforce lots of drilled piers this way. Make sure you provide adequate shear reinforcement between the existing pier and the new cap.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources