INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

E-80 Loading Determmination

E-80 Loading Determmination

E-80 Loading Determmination

(OP)
Does anybody have examples on Defelection Determination (Spangler Formula)

I need to prove to the RR Company that a 36" Casing pipe (coated) is thick(.75") enough to support E-80 Loading.  The casing pipe is going to be approx 3' below the RR Tracks.  2-A modified Stone will be used for backfill.

Thanks.

RE: E-80 Loading Determmination

(OP)
Thanks

RE: E-80 Loading Determmination

Hold on a sec.

Calculating the deflection and controlling with the allowable value is one thing, but when you are talking about a crossing (which I assume is your case since you are talking about casing and E-80 loading)then there are other considerations. Always check the requirements of the authority that has jurisdiction over the road or RR. Most often they have their own restriction and limitations specially regarding minimum depth of passage. Especially for RR the settlement of the casing is crucial and I haven't seen a RR authority who does not have his own crossing requirements (and normally it's more than 3').

Then take a look to the project spec and standards in your field. I assume that you are dealing with a pipeline. API RP 1102, "Steel Pipelines Crossing Railroads And Highways" sets a minimum cover for crossings at highway and RR both for carrier  and casing. For casing pipe under RR crossing, API states the minimum cover measured from top of the pipe to the base of the rail:
a) under track structure proper, except secondary and industry tracks: 5.5 feet
b) under track structure proper, for secondary and industry tracks: 4.5 feet
c) under all other surfaces within the R.O.W: 3 feet
d) for pipelines transporting HVL: 4 feet

So you see it's not only the mater of calculations.
Hope this would help.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources