INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Concrete on a slope

Concrete on a slope

Concrete on a slope

(OP)
Hi Guys

I have in the past seen concrete being pired on slopes, generally not an issue, just reduce the slump. I have a case where the slope is 2:1, i.e. 2m horiz/1m vertical. Could this be problematic and what tips could you offer for pouring on a slope.

In this case the slab is 15m long on the slope from top to bottom.

RE: Concrete on a slope

Keep the slump low and keep the placement rate slow.  Work side to side and up the slope.  Don't let placement occur up and down the slope before going side to side.

RE: Concrete on a slope

We place concrete agitation ramps on 2:1 slopes on a regular basis. Like Ron said, low slump and from the bottom up. I think we typical end up using 3-4" slump concrete. It will be difficult to finish if you are looking for anything other than a screed finish.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources