INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Elevator pit slab lowering

Elevator pit slab lowering

Elevator pit slab lowering

(OP)
A contractor is facing a problem with elevator pit slab poured. The slab was poured 10" higher and now he need to remediate that problem. Also note that the pit wall is already poured & 3 story cmu elevator chase wall constructed on top of the wall.

What's the best to fix that problem without undermining the cmu chase wall?. He needs to cut the slab & have it poured at 10" lower.  

RE: Elevator pit slab lowering

I would jackhammer out the existing slab, trying to save the wall steel stub bars as much as possible, and re-configure the wall steel stubs after the proper elevation is reached to maintain the integrity of the connection, pouring the new slab after that.

May have to do this in a segmented underpinning mode to preserve the integrity of the CMU wall above, as in one side at a time so the wall can span over the voids created.

Mike McCann
MMC Engineering
Motto:  KISS
Motivation:  Don't ask

RE: Elevator pit slab lowering

If the supported loads are not too excessive then you could needle through the CMU wals and support them on props away from the ahft.

You then will have relatively free reign on what to do with the pit.

RE: Elevator pit slab lowering

Wow, big mess up.  I dont' suppose there is a different elevator option?  We have been involved in elevators that require differing pit depths. I would talk directly to the elevator company to investigate other options first.  I bet you could almost double the elevator cost and still walk away saving the GC money.

Brad

RE: Elevator pit slab lowering

(OP)
csd72... Can you please explain a bit more your option?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources