INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Installing buttweld schedule 80 valve into buttweld schedule 40 pipe?

Installing buttweld schedule 80 valve into buttweld schedule 40 pipe?

Installing buttweld schedule 80 valve into buttweld schedule 40 pipe?

(OP)
Does anyone know if it is possible to install a 4" buttweld schedule 80 valve into a buttweld schedule 40 pipe? Both are WC9. Thanks!

RE: Installing buttweld schedule 80 valve into buttweld schedule 40 pipe?

Assuming it satisfied design conditions for your applicable code, it could physically be welded in place with a satisfactory counterbore and taper.  B16.25 would be a good starting reference.   

RE: Installing buttweld schedule 80 valve into buttweld schedule 40 pipe?

(OP)
Thanks for the info.  I do have a copy of ASME B16.25-2007, but I'm unfamiliar with what you mean by counterbore and taper.  As you can imagine, I'm new at this.  I can see the pipe OD is the same for sch 40 & 80, which is a good start.  Looking at the specifications the sch 40 would fit in the sch 80.

RE: Installing buttweld schedule 80 valve into buttweld schedule 40 pipe?

Best way to do this would to get a short length of 4" schedule 80 pipe, and transition (i.e. grind) one end just a little bit from .337" w.t. to schedule 40 w.t. (.237") or within 3/32" difference, such that you don't have to backweld it, while ensuring that your hoop strength calculation for the tapered of the pipe end meets the pressure requirements for your application.

 

RE: Installing buttweld schedule 80 valve into buttweld schedule 40 pipe?

"but I'm unfamiliar with what you mean by counterbore and taper"

. . . not to butt in, but he means that Sch80 will have a smaller ID than Sch40 due to its thicker wall, therefore if you simply weld the 2 ends together, there will be step-down on the ID.  This is dealt with by boring a taper (bevel) on the ID of the Sch80 piece (in your case the valve) so that there is a smooth transition between IDs.  B16.25 might have a recommended taper angle (or length) for connecting dissimilar IDs.

If I remember correctly, I've generally seen this in the reverse of your case, i.e., a Sch40 valve going into Sch80 piping, so the pipe gets the bevel.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources