Can anyone explain why, in a Modal Response Spectrum Analysis, the code requires that the modal base shear is scaled up to 85% of the calculated base shear (ASCE 7-05 section 12.9.4)?
Thanks all!
Thanks all!
RE: Minimum Base Shear
RE: Minimum Base Shear
Setting an absolute minimum like 85% for all structures doesn't really correlate to the adverse effects of modeling. It affects structures with long periods far more than it affects structures with short periods. I'd like to know the reasoning of the code writers.
It seems like a more reasonable approach could be to decrease the modal period of the structure by 15% and calculate an (increased) base shear based on that period. This could then be used as a minimum.
RE: Minimum Base Shear
if you are working with periods that are before the plateau it isn't reasonable to decrease the period. Regards,