INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME B31.3 code clarification
2

ASME B31.3 code clarification

ASME B31.3 code clarification

(OP)
Under the B31.3 requirements for Severe Cyclic Conditions, what percentage of socket welds that have not been tested by radiography or UT must be tested by the MT or PT methods?

 Under the B31.3 requirements for Elevated Temperature Fluid Service, what percentage of socket welds in P-No. 4 and P-No. 5 materials that have not been tested by radiography must be tested by the MT or PT methods?

I have looked at 341.4.3 & 341.4.4 and do not see a definitive answer.  Thanks in advance!

RE: ASME B31.3 code clarification

See B31.3, 341.4.3  under other examination.....

(b) Other Examination. All circumferential butt and
miter groovewelds and all fabricated branch connection
welds comparable to those shown in Fig. 328.5.4E shall
be examined by 100% radiography in accordance with
para. 344.5, or (if specified in the engineering design)
by 100% ultrasonic examination in accordance with para.
344.6. Socket welds and branch connection welds which
are not radiographed shall be examined by magnetic
particle or liquid penetrant methods in accordance with
para. 344.3 or 344.4


See 341.4.4  


(b) Additional Examination. The examination requirements
of para. 341.4.1(b) apply with the following exceptions:
(1) Fabrication for longitudinal welds in P-No. 4
and P-No. 5 materials, except those in components made
in accordance with a listed specification, shall be examined
by 100% radiography in accordance with para.
344.5, or by 100% ultrasonic examination in accordance
with para. 344.6.
(2) Socket welds and branch connection welds in
P-No. 4 and P-No. 5 materials that are not radiographed
or ultrasonically examined shall be examined by magnetic
particle or liquid penetrant methods in accordance
with para. 344.3 or 344.4.
 

RE: ASME B31.3 code clarification

(OP)
Thank you for the answer.  Does this mean that 100% must be MT or PT?

RE: ASME B31.3 code clarification

Jellopool,
Yes, 100% is required,
Regards,
Kiwi

RE: ASME B31.3 code clarification

Also, if the Cyclic involves vibration, make the socket welds a 2:1 weld.  The nuclear power industry has found out that vents and drains socket-welded in and subjected to severe vibration [harmonics] crack out unless the pipe-leg of the socketweld is about twice as 'tall' as the leg onto the fitting.  Cheap insurance.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources