INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Old Concrete Joist System - F/A Joists

Old Concrete Joist System - F/A Joists

Old Concrete Joist System - F/A Joists

(OP)
I have a renovation going on with a building from the '50s.  The existing floor system using a precast joist system called F&A. It is an inverted tee concrete joist with a precast panel between them that is topped with concrete.

The drawings call out an 8" F/A Joist #867.  I am trying to figure out the capacity of the joists.  I was told that the first number is depth and the second number is allowable pounds per sq. foot. So the #867 would be 8" deep with an allowable load of 67 psf.  I have no idea if this is true.  If anyone can help that would be great.  Thanks in advance.

RE: Old Concrete Joist System - F/A Joists

(OP)
I noticed an article in Structure Magazine and tired to contact the author, but the email was disconnected.

Any help would be great.

RE: Old Concrete Joist System - F/A Joists

There were and still are many F&A systems used. They varieties, materials and details vary with the location. Obviously the designations are different, so it would be imperative to research the general area of the project and possible suppliers for actual information.

Generally, most suppliers of the systems and the load ratings are firms that produce prestressed concrete products and molded concrete block (using unusual aggregates)or also sell clay block.

Typical applications are for shorter spans with the beam spacing depending on the size of specialized filler blocks. In Europe, the systems usually used a 2" thick concrete topping to carry a double loop (one for a spare) of hot water. The older systems usually used clay block as fillers, but the newer systems used concrete block with specialized aggregates.

In Hungary, very shallow beams (4" or 6") are used along with concrete block or block made from wood shavings/sand/cement mixture with a 2" topping for leveling and acceptance of hard floor finishes. This is also used for a beam system on roofs with 1:1 pitch.

Most western European and some U.S. systems were based on the German standards that are very detailed and specific. The same applies to system produced in parts of Africa.

Because it is a general construction method with local variations it is important to find the local details and since the beams are to common element, precasters in the region would be the best place to look for history and details. The 1950's was before the PCI plant certification program and requirements, many manufacturers still have good information, standards, designations and test information. - This would be the place to start your search.

Dick

Engineer and international traveler interested in construction techniques, problems and proper design.

RE: Old Concrete Joist System - F/A Joists

(OP)
Thanks I will start calling a couple precasters I know

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources