INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Arch Flash Labeling

Arch Flash Labeling

Arch Flash Labeling

(OP)
I have two electric panels 3000 and 4000 amps. What would be the proper Arch Flash Labeling on these panels? This is a high rise commercial building and maintenance staff does not have the authority to open these panels. Thanks.

RE: Arch Flash Labeling

You need an arc flash study done for it, which also requires a short circuit and coordination study. Hire an engineer who has done this before. When you are at it, it may be not cost you much more to get rest of the system.  

Rafiq Bulsara
http://www.srengineersct.com

RE: Arch Flash Labeling

I'm just seconding Rafiq's answer.  You need an engineer to do the work first (arc flash hazard analysis), and he or she will advise the required labeling.

We can't do it from afar.

Good on ya,

Goober Dave

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources