INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Static Resistance

Static Resistance

Static Resistance

(OP)
I have a client who is purchasing an existing building. He needs the slab on grade analyzed to determine if it has enough "static resistance" to support 1T/m^2

I am not familiar with the term static resistance in this regard- but it sounds like the slab allowable load- Does anyone have any further insight into this phrase?

Thanks
 

RE: Static Resistance

Ask the client what "static resistance" means.

RE: Static Resistance

Ask him if he means allowable load.  Sounds like he just doesn't know the lingo.  Instead of 1T/m^2, the loading should be expressed as 10 kPa, and any competent slab on grade should be able to support that.  But there is a lot more to assessing the performance of a slab on grade than its gravity load carrying capacity.  You should be looking at the joints and cracks.

RE: Static Resistance

Like hokie said, the slab joints and surface condition may be more of an issue if they will be running forklift traffic on this slab.

Also, how do you anticipate analyzing the existing slab?  Do you have record drawings?  Just because you know the slab thickness and design subgrade reaction, who knows how the contractor compacted the subgrade, or if there are settlement or other soil issues hidden beneath the slab (do you have a record Geo Report), etc?    Plus, don't count on reinforcing if WWF -> most likely it is sitting on (or punched thru) the vapor barrier (if there is one)

If it is that critical, may be worth taking a core through the slab, and even extending down into the subgrade and soils.  Or, note the unkowns you are dealing with in your analysis to CYA

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources