Room design method - attic
Room design method - attic
(OP)
As a combustible attic space frequently governs the water demand requirements,the cost of water storage and pump capacity can be lessened by having the /architect contractor separate the attic into 30min. rated compartments with self-closing access hatches between compartments which would satisfy the requirements for room design method.
Any thoughts/concerns?
Thanks
R M Arsenault Engineering Inc.
www.rmae.ca





RE: Room design method - attic
RE: Room design method - attic
R M Arsenault Engineering Inc.
www.rmae.ca
RE: Room design method - attic
Does 13 back this design in an attic???
And we are talking commercial not residental ?????
RE: Room design method - attic