How long would it take...
How long would it take...
(OP)
I have very rough hand drawing of a chair that I would like to have CAD drawn in 3D before going forward with manufacturing a sample. Can someone give me a rough idea how long it should take a pro to do both 3D and actual lay out for manufacturing? And how do I go about finding someone to do it?
Thanks for your help,
Vic
Thanks for your help,
Vic





RE: How long would it take...
Have you considered a local university or trade school? Or, the intended manufacturer of the chair may have a drafter whose work they can recommend.
Ron
RE: How long would it take...
If you wuld like to e-mail me the hand skecth
I can tell you how long will it take
Humberto Garcia
Film Art Director
Toronto Canada
h1954@sympatico.ca
RE: How long would it take...
The layout of demensioning for construction can take another 4 hours of annotation and demensioning and plotting.
Then add another 1 or so to look over the drawing to make sure you haven't missed anything. Then another 30 minutes to pick up the last bit of mark ups.
RE: How long would it take...
RE: How long would it take...
RE: How long would it take...