INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Trolley Hoist Beam Attachment

Trolley Hoist Beam Attachment

Trolley Hoist Beam Attachment

(OP)
I'm to connect a trolley hoist beam rail to the underside of a new hollow core concrete roof panel. I have the opportunity to precast embedded connectors. I'm looking for a standard detail, if there is one, or a code reference for this type of installation.  The rail is a 5 inch deep wide flange beam.  Load limit for hoist is one ton.

RE: Trolley Hoist Beam Attachment

Tippit:
Regardless of whether the crane rail runs parallel or perpendicular to the hollow core plank you have to show the loading and location on your plans so they are aware of it.  They will probably have some std. inserts that fit the bill.  Also, talk this over with the crane suppliers, they will likely have some stds. as to insert detail and products, spacing vs. rail deflection, etc.  Then, coordinate the shop drawings.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources