INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Epoxy Coated Rebar

Epoxy Coated Rebar

Epoxy Coated Rebar

(OP)
I am doing rehabilitation of a concrete structure. The plan is to chip of the existing concrete; and to expose the existing epoxy coated rebars and leave them in place; and then to pour the new concrete. Before pouring the concrete, how do I clean the epoxy coated rebars? I understand that for black we can abrasive blast clean. I do not want to replace the existing rebar coz it is hard in construction point of view.

RE: Epoxy Coated Rebar

Low pressure water wash only.  Do not abrade or high-pressure wash the bar.  Inspect for damaged coating and repair using a two-part epoxy patching material (ASTM A775).  Clean exposed bar to sound steel before repairing the coating.

Why is the rehab required?  If the bars are corroded, you will need evaluate the remaining strength of the bars, and supplement or replace if required.

RE: Epoxy Coated Rebar

I agree with TX, the question of why the concrete is being replaced rings alarm bells in my mind.

Can you please help me silence them by giving us some more background information.

RE: Epoxy Coated Rebar

More background information would be helpful.

Are you able to develop adequate bond in the existing bars within the new concrete?  Perhaps a rough sketch would be useful.

BA

RE: Epoxy Coated Rebar

(OP)
Thanks for the replies.

There is map cracking at the surface of the sidewalk of a bridge. The rebar is fine according to the condition report. Therefore we are planning to replace the top portion of concrete only.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources