Smart questions
Smart answers
Smart people
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Member Login

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips now!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

Join Eng-Tips
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

LINK TO THIS FORUM!

Add Stickiness To Your Site By Linking To This Professionally Managed Technical Forum.
Just copy and paste the
code below into your site.

Partner With Us!

"Best Of Breed" Forums Add Stickiness To Your Site
Partner Button
(Download This Button Today!)

Feedback

"...The enviroment is simple, natural and efficient. The members are competent, educated and professionals..."

Geography

Where in the world do Eng-Tips members come from?
Maark (Mining)
3 Jan 11 22:34
Hi, I am just wondering about ventilation requirements in Canada. I read that you require 100cfm per diesel HP of equipment in a single circuit - but what does a single circuit mean?

I basically want to know if your total cfm entering the mine must provide for the sum of all simultaneously operating headings, or if it can be reused on each heading to provide each heading with supple used air as long as gases limits are not reached.

If it is the former case, is it in writing anywhere legitimate?
miningman (Mining)
5 Jan 11 22:00
  Basically the answer is yes in all cases.  Yes you can re use the air but you have to maintain the 100 cfm / hp formula at every location where diesel equipment is in use.  Each development heading,  with say 300 operating HP requires 30,000 cfm but if you have three such headings in an area developed off a ramp , you need  90,000 cfm in the ramp and if the theoretical mine had two ramps in parallel, exhausting thru a single vent raise,  you need 180,000 cfm total to feed the  1800 operating HP.

The details and actual rules vary by province,  but seek out either British Columbia or Ontario Mines Regs.


Other factors do come into play  and the 100cfm / hp becomes an effective minimum.   
Maark (Mining)
6 Jan 11 12:40
Fantastic, that is what I though. I was in an argument with my employer and they seemed to think that if you had a mine with say 60 000cfm total fresh air intake, you could reuse that air to any extent and as long as auxiliary ventilation was sufficient, you could even have a single heading with more than 600HP.

I guess it is time to get a new employer!

Thanks a ton for your response.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close