INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Shear Breakout for Anchors according to ACI 318

Shear Breakout for Anchors according to ACI 318

Shear Breakout for Anchors according to ACI 318

(OP)
I've got a question about determining the concrete breakout for shear loading according to Appendix D of ACI 318. From the attached sketch, I have a steel column (which is part of a braced frame) anchored to a concrete T-beam below (24" beam + 8" slab). The shear load is pretty big and I'm getting the section to fail under concrete breakout, but I'm not sure about my breakout area calculation.

In reference to Section A-A from my sketch, I've used the edge distance from the anchors to the edge of the concrete beam, but this neglects the continuity of the 8" slab above, which I would think would add significant shear resistance.

The beam is heavily reinforced, so I think I'm just going to rely on the reinforcement to restrain breakout and check it as per Chapter 12, but I'm curious as to how you'd arrive at a concrete breakout resistance for this type of section.

Any input is appreciated.

RE: Shear Breakout for Anchors according to ACI 318

It appears that you are going about it the correct way.

App. D properly accounts for shear failure when you are close to an edge when you get away from an edge the equations get a little screwie there is technically no exception for shear breakout like there is for concrete breakout.  I would add additional rebar developed into the slab to take the shear load.
 

RE: Shear Breakout for Anchors according to ACI 318

Don't ignore the 8" slab.

RE: Shear Breakout for Anchors according to ACI 318

If you can get some positive transfer from the base plate into the slab using a downward fin on the base plate, attached to a rebar connector, and do this both ways into the slab, then the shear problem you describe goes away, doesn't it?

RE: Shear Breakout for Anchors according to ACI 318

I would just provide reinforcing developed past your last line of anchors and developed into the slab to carry the shear force.

ACI 318-08 has some good sketches in Appendix D.

RE: Shear Breakout for Anchors according to ACI 318

You may also want to consider a shear lug for the shear (HSS or WF welded to the bottom of the base plate) and then use anchor rods for the tension. You can then design it for a bearing shear failure (similar to your failure sketches), but you can reinforce accordingly, similar to a corbel... This gets you out of Appendix D for the shear design. No matter what I like a couple of stirrups placed through the shear triangle and the legs extend back into the structure.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources