I'm updating old drawings that don't have a model based bom, instead they just use blocks or a general table. Aggravating and error prone to sort and revise. 8-|/|
I've used virtual parts in the BOM, (right click, insert new part) to get the P/N, qty etc in the BOM, but you have to enter that each time that you use it.
I thought about making dummy parts of solvent, packaging, labels that have these properties, so I can just include them in the assy and hide them. Has anybody worked with one or the other?
I've used virtual parts in the BOM, (right click, insert new part) to get the P/N, qty etc in the BOM, but you have to enter that each time that you use it.
I thought about making dummy parts of solvent, packaging, labels that have these properties, so I can just include them in the assy and hide them. Has anybody worked with one or the other?






RE: Virtual vs. Dummy parts
I vote dummy part.
-Dustin
Professional Engineer
Pretty good with SolidWorks
RE: Virtual vs. Dummy parts
Dan
www.eltronresearch.com
Dan's Blog
RE: Virtual vs. Dummy parts
FYI ... In SW2011, dummy parts (or any other parts) can be converted to virtual if required, but I don't think that will help in this case.
RE: Virtual vs. Dummy parts
h