INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

High Moisture Content Soil

High Moisture Content Soil

High Moisture Content Soil

(OP)
I have a jobsite in which the water table is very high (9ft) The project required ecxcavating 38 feet deep and stockpiling the material onsite for 2 months.  Even with dewatering wells, the water does not fall out of the soil so it stays vary saturated.  The stockpiled material is also still very moist even at the very top.  When compacting this material for backfilling, we are getting roughly 90-94% maximum density, but with 6-8% moisture content.  What is expected of the behavior of the soil if it is backfilled with that high of moisture if the existing surrounding ground contains an even higher moisture content naturally? The project is a lift station with the bottom of the wet well sitting on shale, so it wont settle.  The valve vault is sitting at approximately 9ft down from the top of ground which will be placed on backfilled material.  will this ground settle?

RE: High Moisture Content Soil

First, much of this depends on the type(s) of soil that you have.  You haven't identified what you have.  What is the moisture content of the soil in situ?  You indicate that the moisture content on compaction is 6 to 8%.  This isn't very high unless you have a medium to fine sand.  Please provide this information.  Also, how long were the dewatering wells (presumably deep wells) working before you began excavating?  Did the soil have a chance to react to the dewatering before excavation?

RE: High Moisture Content Soil

(OP)
the soil is a 30-40 pi clayey  / very fine silt. The wells were in place for about a month and the water is holding in the soil- it moves slowly like a glacier and has particles so fine it clogs the wells screens.  

RE: High Moisture Content Soil

Why are you using this material for backfill?  Trying to compact this material without some modification is going to be a waste of time.

I agree with BigH...6-8 percent is very low....for the material you are using, I would expect optimum to be a bit higher.

Could you post your Proctor curve?

RE: High Moisture Content Soil

Maybe you should have put the wells under a vacuum to draw the water down.  I would have thought you'd backfill with a granular soil - much easier to place, level and compact.

RE: High Moisture Content Soil

Generally, 30 feet of fine-grained soil compacted to 95% maximum standard Proctor can be expected to settle 1% to 2% of its thickness when it becomes saturated.  Your soil sounds unusual, and I could not predict its behavior, but I am very cautious about supporting structures on a thick backfill next to a structure that won't settle.  Perhaps a highly compacted clean crushed stone backfill could be trusted.  I would use flowable fill or move the vault out of the backfill and build a beam to support the pipe.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources