×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Align two broken views

Align two broken views

Align two broken views

(OP)
Hello,

is it possible to align two broken views of the same part (see attached picture)?

Thanks.

RE: Align two broken views

What you have to do is make FOUR separate broken views, TWO for each end of the parts so that you end up looking like what you have.  To do that you will need to create TWO pairs of Top and Front views and then create SINGLE segment 'Broken' views of each of end of each view.  In order to get them to align you need to assign 'Anchor Points' at the end points of the parts in each 'Broken' view so that when you move an individual view it line up with the 'Anchor Point' of the appropriate view.

Other then trying to define identically sized broken view identically placed breakout section curves, I can't think of another way to do this and get the results you desire.

John R. Baker, P.E.
Product 'Evangelist'
Product Design Solutions
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
http://www.siemens.com/plm
http://www.plmworld.org/museum/

To an Engineer, the glass is twice as big as it needs to be.
 

RE: Align two broken views

(OP)
Thanks John, I got it.
One more thing, totaly off-topic, but concerned with NX: adding darts: is it possible to create non-symetric dart?

thanks
 

RE: Align two broken views

By definition, the 'Darts' created as features by NX are always symmetrical.  Therefore, if you wish to define something different, it will have to be constructed from scratch using manual methods.  Of course, if this is something that you're going to need to do a lot, you could create a UDF (User Defined Feature) and add it to your 'Reuse' Library.

John R. Baker, P.E.
Product 'Evangelist'
Product Design Solutions
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
http://www.siemens.com/plm
http://www.plmworld.org/museum/

To an Engineer, the glass is twice as big as it needs to be.
 

RE: Align two broken views

i do it like this....
In model space, while still in the draft file, on an un-used layer, create planes within the part, where you approximately want the break lines, then on another un-used layer, create intersections on the part, with those planes, which you'll later use to snap the break lines to.
Then, go into drafting, after turning off the planes layer, then create your views, then when you add broken views to them, you can pick the same points, so the views stay the same length, and will therefore line up..
The part you showed will work fine like this, as it's the same height in front and plan views..
However, if like me, (you use the jagged broken lines), this becomes slightly more complicated, if the part is say an un-equal angle section,because the jagged lines become wider and so make the views different lengths, sooooo...
then i create 2 more planes equally either side of the first ones you added, and add these into the intersection feature, then, when back inside the broken views, you can, "move boundary points" and pick the corners of the zig-zags, and associate them to the planes also...
When all done the views will stay the same length, and so will align properly....phew..!!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources